Tech Solution
-
O&M
How to handle energency cases in PV system(Part I)
Jonas 2022-06-28 13:02
Two highly discussed safety issues for PV systems are how to prevent these accidents, as well as reduce loss in these emergency cases.
-
O&M
Ripple control receiver
Elena 2022-05-30 11:06
GoodWe provides two methods including the inverter itself or an external device like Ezlogger Pro.
-
O&M
Introduction of New Data Transfer Method --- Apache Kafka
Spencer 2022-04-06 13:47
GoodWe developed a new data transfer method based on Apache Kafka, which can keep data for a certain time.
-
O&M
Application of Shunt Trip DC Switch on String Inverter
Craig 2022-03-07 10:39
This article introduces shunt trip DC switch on String Inverter to give your PV system a more effective electrical protection.
-
System Communication
GooWe SCADA Solutions
Elena 2022-02-10 11:27
This article introduces two communications solutions to ensure the interoperability between GoodWe inverters and SCADA system.